1施工預備:
1 construction preparation:
(1)施工前應預備好圖紙(沈陽塑料托盤),編制屋頂防水工程施工方案,然后由專業技術人員操作人員持證上崗。
(1) should be prepared before the construction drawings, construction scheme of waterproofing system, and professional and technical personnel from the operating personnel certificates.
(2)鋪貼屋頂防水層的下層必須按設計施工完畢,并經養護后干燥,含水率不大于9%;下層應平整、牢固網絡營銷公司,不空鼓開裂、不起大砂。
(2) waterproof layer paving the grassroots must according to the design and construction is completed, and after curing, drying, moisture content is less than 9%; the base layer should be flat and firm, no cracking, no sand.
(3)屋頂防水層施工涂底膠前,應將下層外觀清理干凈。
(3) the waterproof surface should be cleaned before coating the base.
(4)施工用材料均為易燃,因而應預備好響應的消防器材。
(4) construction materials are flammable, so should be prepared corresponding fire equipment.
2宜用材料:
2 materials should be used:
1施工預備:
1 construction preparation:
(1)施工前應預備好圖紙,編制屋頂防水工程施工方案,然后由專業技術人員操作人員持證上崗。
(1) should be prepared before the construction drawings, construction scheme of waterproofing system, and professional and technical personnel from the operating personnel certificates.
(2)鋪貼屋頂防水層的下層必須按設計施工完畢,并經養護后干燥,含水率不大于9%;下層應平整、牢固,不空鼓開裂、不起大砂。
(2) waterproof layer paving the grassroots must according to the design and construction is completed, and after curing, drying, moisture content is less than 9%; the base layer should be flat and firm, no cracking, no sand.
(3)屋頂防水層施工涂底膠前,應將下層外觀清理干凈。
(3) the waterproof surface should be cleaned before coating the base.